图片名称

Gladstone Project, Australia

introduction

The Gladstone Ports Corporation was given the responsibility of removing 48m cubic metres of sediment from the seabed to expand the harbour so that large ships could enter it.

Key features:

Deepening and widening of existing channels and swing basins

Creation of new channels, swing basins and berth pockets

Use of dredged material to reclaim land, including 153 ha north of Fisherman's Landing

Dredging and reclamation works in Australia: Unisite supplied the dredging pipeline including y-piece, bend and most wearing pipes (35mm) for Gladstone project.

 

 

未标题-1(79).jpg
未标题-2(63).jpg
未标题-3(59).jpg
未标题-9(37).jpg
未标题-10(36).jpg
图片名称

PREV:

图片名称

NEXT: