![图片名称 图片名称](/npublic/img/s.png)
USA Beach
introduction
This project involved beach renourishment work and hurricane dune construction along a one-mile-long stretch of the Beach in New Jersey. The cutter suction dredge excavated the sand from an offshore borrow area and pumped it through 36,000 feet of pipeline onto the beachfront.
Unisite supplied the large quantities of pipeline including sink pipes, shore pipes with flanges, piling pipe and dredger spare equipment to support customers to complete the work.
![1(3).jpg 1(3).jpg](/npublic/img/s.png)
![2(2).jpg 2(2).jpg](/npublic/img/s.png)
![未标题-1(28).jpg 未标题-1(28).jpg](/npublic/img/s.png)
![4(2).jpg 4(2).jpg](/npublic/img/s.png)
![图片名称 图片名称](/npublic/img/s.png)
PREV:
![图片名称 图片名称](/npublic/img/s.png)
NEXT:
HOW CAN WE HELP YOU?
Get in touch and we will help you.
![Back to top Back to top](/npublic/img/s.png)
![UNISITE UNISITE](https://omo-oss-image.thefastimg.com/portal-saas/new2022101216103282132/cms/image/ecff0b84-2c1e-4683-8974-8a578d1867b0.png)
UNISITE
![Close Close](https://omo-oss-image.thefastimg.com/portal-saas/new2022092117463732502/cms/image/3734a3d5-2c86-4324-bbea-8de9a7e57b29.png)