Vietnam, Ha Tinh Steel Mill Complex
introduction
To construct this complex, a total of 2,000 ha need to be reclaimed. The required dredged soil, a total of 80 million m³, is being sourced from the construction of the adjoining Son Duong Port. In this harbor our customer started the dredging works of the 8 km long channel at a depth of up to 27 m and the dredging works of the harbour basin at 24 m. During the implementation of this project, at peak moments up to 1.5 million m³ was reclaimed per week.
Unisite supplied the large quantities of pipeline including sink pipes, shore pipes with flanges, piling pipe and dredger spare equipment to support customers to complete the work.
![1(11).jpg 1(11).jpg](/npublic/img/s.png)
![2(10).jpg 2(10).jpg](/npublic/img/s.png)
![3(11).jpg 3(11).jpg](/npublic/img/s.png)
![4(9).jpg 4(9).jpg](/npublic/img/s.png)
![5(9).jpg 5(9).jpg](/npublic/img/s.png)
![6(7).jpg 6(7).jpg](/npublic/img/s.png)
![7(5).jpg 7(5).jpg](/npublic/img/s.png)
![8(4).jpg 8(4).jpg](/npublic/img/s.png)
![9(3).jpg 9(3).jpg](/npublic/img/s.png)
![图片名称 图片名称](/npublic/img/s.png)
PREV:
![图片名称 图片名称](/npublic/img/s.png)
NEXT:
HOW CAN WE HELP YOU?
Get in touch and we will help you.
![Back to top Back to top](/npublic/img/s.png)
![UNISITE UNISITE](https://omo-oss-image.thefastimg.com/portal-saas/new2022101216103282132/cms/image/ecff0b84-2c1e-4683-8974-8a578d1867b0.png)
UNISITE
![Close Close](https://omo-oss-image.thefastimg.com/portal-saas/new2022092117463732502/cms/image/3734a3d5-2c86-4324-bbea-8de9a7e57b29.png)